Horizontal Directional Drilling · 811 Ticket Management

811 Ticket Management Software Built for HDD Contractors

Quick811 helps directional drilling contractors organize locate tickets by bore path, track positive response status, and make sure drill crews never mobilize before the job is actually cleared — from one simple dashboard.

14-day free trial · No credit card required · Cancel any time

The HDD ticket management challenge

HDD crews can't afford to wait on unclear ticket status

Directional drilling moves on production, and every delay costs real money. But the 811 locate ticket process creates a bottleneck that most HDD contractors manage through a combination of email, phone calls, and memory — which works until a crew mobilizes before positive response is confirmed, or a ticket expires mid-project on a job that's still active.

When a bore crosses multiple utility corridors, road crossings, or easement zones, ticket volume stacks up fast. Each segment has its own utility owners, its own response status, and its own expiration clock. Quick811 gives directional drilling contractors a single place to stay on top of all of it — without slowing down production.

Multi-segment ticket volume

Long bore paths often require separate tickets for each crossing or easement zone

Positive response is required

Each utility owner must respond before a drill crew can legally begin boring

Expiration risk on long projects

Multi-day and multi-week HDD projects are especially vulnerable to ticket lapses

Mobilization costs are high

A crew arriving at an uncleared site means expensive idle time and remobilization

How Quick811 helps

Built for how Horizontal Directional Drilling contractors actually work

Not adapted from a generic project management tool. Purpose-built for contractors who track 811 tickets as part of every job day.

Bore Path Ticket Organization

Organize every 811 ticket by job, bore segment, or crew assignment. Know at a glance which segments are cleared and which are waiting — without digging through email or calling the office.

Positive Response Tracking

See which bore segments have confirmed positive response and which still have outstanding utility responses. Drilling before all responses are in is the most common source of legal exposure for HDD contractors — Quick811 makes the status impossible to miss.

Expiration Alerts

Long HDD projects span days or weeks — tickets submitted at the start of a multi-segment job can expire before the crew reaches that section. Quick811 surfaces expiring tickets before they lapse on an active job site.

Office and Field in Sync

Project managers, dispatchers, and drill crew leads all see the same ticket status in real time. No more calling the office to ask if the bore is cleared. The answer is already in front of whoever needs it.

Free 2-minute calculator

How much time is 811 ticket tracking costing your Horizontal Directional Drilling operation?

Answer a few questions about your ticket volume, crew count, and current process. We'll estimate how many hours Quick811 could save your team each week.

No signup required Instant result Takes about 2 minutes

Sound familiar?

Signs your operation needs a better system

Most Horizontal Directional Drilling contractors find Quick811 after one of these moments. If any have happened to your team, your current ticket tracking process has a gap.

A drill crew showed up to a job before all utility locates were confirmed

A bore segment ticket expired mid-project and nobody on the team caught it

Your PM had to stop production work to manually track down ticket status

You're running multiple rigs across multiple jobs and tracking tickets by email

Common questions

Horizontal Directional Drilling and 811 ticket management — answered

Everything Horizontal Directional Drilling contractors ask about 811, positive response, and how Quick811 fits into the workflow.

What is 811 for HDD contractors?

811 is the national call-before-you-dig system in the United States. Before any horizontal directional drilling, boring, or underground excavation, contractors are required by law to contact their state's one-call notification center by dialing 811 and submitting a locate request. The center notifies affected utility owners, who must locate and mark their underground infrastructure before drilling begins. The confirmation that all utilities have responded — called positive response — must be verified before HDD crews can legally and safely proceed.

How do HDD contractors track their 811 locate tickets?

Most HDD contractors start by tracking locate tickets through email, phone calls, or spreadsheets — but that approach breaks down quickly when you're managing multiple bore jobs, different utility owners, varying expiration timelines, and multiple crew schedules simultaneously. Quick811 gives directional drilling contractors a centralized dashboard to organize tickets by job or bore segment, track positive response status for each utility, monitor expiration dates, and keep office and field crews aligned on what is actually ready to drill.

What is positive response for HDD drilling?

Positive response is the confirmation from each utility owner that they have responded to a locate request. After an HDD contractor submits an 811 ticket, each utility with infrastructure in the bore area must respond by the state-specified deadline — either by marking their lines, indicating no conflict, or requesting additional coordination. Positive response must be confirmed before drilling begins. For HDD contractors managing multiple bore paths or long routes, tracking positive response status across every active ticket is one of the most critical — and frequently missed — parts of the daily workflow.

What happens if an HDD crew drills before positive response is confirmed?

Drilling without confirmed positive response is a violation of state law and creates serious legal and financial exposure. If a utility is struck during boring, the contractor can be held liable for repair costs, service restoration, and downstream damages — regardless of whether the utility owner responded to the ticket. In states with strict damage prevention laws, drilling before positive response can also result in civil penalties and mandatory project shutdowns.

Does Quick811 replace the 811 locate request process?

No. Quick811 does not submit 811 locate requests or replace the one-call process. You continue submitting tickets through your state's one-call center as you normally would. Quick811 is the management and tracking layer that helps HDD contractors organize those tickets by job, monitor positive response status, track expiration dates, and keep their teams aligned — all after the tickets are submitted.

Which HDD operations benefit most from Quick811?

Quick811 is most valuable for HDD contractors running multiple active bore jobs simultaneously, working on large multi-segment projects with high ticket volume, or growing from manual systems into purpose-built software. It is especially useful for small-to-mid-sized directional drilling contractors where the owner, PM, or dispatcher is responsible for tracking ticket status alongside other operational duties — and where a missed ticket can shut down an entire day of production.

14-day free trial · No card required · Cancel any time

Ready to stop tracking bore tickets through email?

Quick811 is set up in minutes and built for HDD contractors who need clear ticket visibility without spreadsheets, daily status calls, or idle crews waiting on locate confirmation.

Built for Horizontal Directional Drilling contractors. Not adapted from something else.

HDD · Fiber · Telecom · Underground Utility · Excavation · Heavy Civil